30
Yasuo MIAKE, Univ. of Tsukuba
KEK test beam plan
•KEK test beam in Dec.
–Proposal will be submitted in September
–Need names of participants
•Prototypes to be built
–Type-A; 12 x 12 w 3”  (BELLE)
–Type-B; 20 x 20  w 3”
–Type-C; 20 x 20 w mirror
•Items to be tested
–# of p.e. vs. mom.;  0.4 - 4 GeV/c
–# of p.e. vs. thickness
–Position of PMT
–Air between Aerogel and PMT
–Direction of stack
•Call for issues/ideas!
PMT
Aerogel
0.5 - 4 GeV/c