phase 5

Run 39340 - 40655

( Jan.9.2002 - Jan.23.2002 )

Jan.9.2002
TZR South 6 and South 8 channel was switched.
After ;
TZR-S6 : board 2 , channel 2 , iValue 19
TZR-S8 : board 2 , channel 1 , iValue 17
Before ;
TZR-S6 : board 2 , channel 2 , iValue 17
TZR-S8 : board 2 , channel 1 , iValue 19
phase 4

Run 38391 - 39109

( Jan.4.2002 - Jan.9.2002 )

Jan.3.2002
Put a attenuator and disconnect 1nsec cable
on TZR South 1channel .
phase 3

Run 37937 - 38225

( Dec.30.2001 - Jan.3.2002 )

Dec.30.2001
Put a attenuator and disconnect 1nsec cable
on TZR South 1, S3 , North1 , N3 channel .
And change TZR HV
phase 2

Run 36939 - 37890

( Dec.20.2001 - Dec.29.2001 )

phase 1
Dec.20.2001
Cable Length of all channel was changed.
TZR South 1and North 8 channel was switched.
After ;
TZR-S1 : board 2 , channel 7 , iValue 23
TZR-N8 : board 3 , channel 6 , iValue 30
Before ;
TZR-S1 : board 3 , channel 6 , iValue 30
TZR-N8 : board 2 , channel 7 , iValue 23

Run 34624 - 36763

( Dec.14.2001 - Dec.19.2001 )

TZR status during p+p Run